Part 3 of 5 – The Details That Define Quality

You might ask, “Why five parts for one project?” The answer is simple—details. At OCC, we believe the details tell the real story. They show the craftsmanship, the precision, and the care that set our work apart. Skipping over them would mean missing the essence of what makes OCC different. This phase of the Hudson River project offers a close look at those finer elements, including chinking and the installation of granite waterside steps.

By Part 3, most of the heavy lifting was complete, and the focus shifted to the intricate finishing work. One of the most impressive tasks was constructing a tapered natural base and setting massive granite steps that lead down to the river—a challenging process that required both strength and precision.

Equally important was the chinking stage. Chinking is the meticulous, hands-on process of fitting smaller stones to lock larger foundation stones securely in place. Some of these “small” stones can weigh over 100 pounds and must be carefully placed or even hammered in to ensure tight interlocking. Over time, as the revetment settles, these stones help the entire structure strengthen and stabilize.

Chinking may be slow, tough work, but it’s critical to the integrity of every OCC build. It’s the kind of detail that ensures strength, durability, and long-term protection—and it’s what OCC does best.